Permit & CD Packages

Permit Drawings in Dubai & Construction Document Sets

Bonarch Draft prepares permit drawings in Dubai and construction document sets for architecture firms, consultancies and fit-out contractors, under your title block for your registered consultant to stamp and submit. Sets run USD 85–140 per A1 sheet in AutoCAD or USD 120–210 in Revit; a small fit-out permit set takes 1–2 weeks and a villa set 3–8 weeks, not counting authority review.

Prepared for your consultant's stamp
DM · DDA · Trakhees · DCD
Permit sets & full CD sets
Point-by-point comment responses
Project-based pricing

Permit sets and construction documents

A permit set proves to the authority that the design complies with the regulations. A CD set shows the contractor exactly what to build.

Permit Sets
  • Site plan
  • Plans, sections and elevations
  • Code analysis
  • Fire and life safety plans: exits, travel distances, fire ratings
  • Accessibility
  • Area and use schedule
Construction Documents
  • Everything in the permit set, plus:
  • Details and wall types
  • Door, window and finish schedules
  • Reflected ceiling plans (RCP)
  • Interior elevations and millwork
  • Specifications
Who Does What
  • We prepare the set under your title block
  • Your consultant reviews, stamps and signs it
  • Your consultant submits it to the authority
  • We never submit to authorities directly

Structural and MEP sheets come from your consultants. We coordinate them against the architecture and run clash checks; see our MEP coordination service.

How we Work

You send your finished design, or bring us in during design development and we produce the drawings and model alongside your design team.

Scope review: the authority, the set type and your consultant's requirements are confirmed before production starts.

Production: the set is prepared under your or your consultant's title block and coordinated with your structural and MEP consultants' drawings.

Submission by your consultant: your consultant reviews, stamps, signs and submits the set. We never submit to authorities ourselves.

Authority comments: we answer each comment point by point in a response letter, cloud the changes, update the revision table and reissue the set to your consultant.

Where your set goes

Your consultant submits to the authority that governs the site: Dubai Municipality for most projects in the city, DDA for free zones such as Dubai Design District, Trakhees for Jebel Ali and the ports, Dubai Civil Defence for fire and life safety, and master developers such as Nakheel and Emaar where they run their own approvals. We prepare the set to the requirements your consultant specifies for that submission.

Where we start

Most projects start from your finished design. On projects still in design, we can work alongside your design team through design development, producing the drawings and the model as the design evolves and is corrected.

Typical timelines

Typical production times (authority review time is not included):

  • Small fit-out permit set: 1 to 2 weeks
  • Villa permit or CD set: 3 to 8 weeks
  • Larger projects: 2 to 4 months

Frequently asked questions​

Tell Us About Your Project
Where is your project located?

By sending this form you agree to our Privacy Policy.

Related services

Drafting and BIM support for architecture and fit-out teams in Dubai.

Not sure about scope or budget? Estimate your cost in 2 minutes →

New · 2026Dubai Circular 9-1-3: BIM is now required above G+12 and 15,000 m²What the circular says, which projects it covers, and how to prepare your permit set.Read the guide →