Bonarch Draft prepares MEP coordination drawings in Dubai for architecture firms, consultancies and fit-out contractors: we combine your consultants’ MEP and structural models with the architecture in Navisworks, resolve the clashes and issue combined services drawings. Coordination is priced per project after we review your models, and a one-off coordination round on a finished model takes around 1–3 weeks.
We coordinate the models your consultants produce, checking every MEP system against the architecture, the structure and each other.
MEP calculations and design stay with your MEP consultant; our role is coordination only. For the architectural and interior model itself, see our BIM modeling service.
Every coordination round produces a combined coordination model and a clash report. Where your scope includes coordination drawings, we also deliver combined services drawings showing all systems on one plan, ceiling void sections, builder’s work drawings for openings in walls and slabs, and a coordinated reflected ceiling plan (RCP).
The LOD of MEP models is set by your consultant, since they produce them. For meaningful coordination, MEP models should be at least LOD 300: correct geometry, size and position for ducts, pipes and trays. At LOD 350 they also show connections, supports and maintenance clearances, so coordination can go further.
The conflicts that come up on almost every project:
Coordination runs in two ways:
Priced per project after we review your models. Any drawings in the scope follow our per-sheet prices: USD 85–140 per A1 sheet in AutoCAD and USD 120–210 in Revit.
Bonarch Draft is based in Toronto, and our production team works from the Middle East, on Dubai hours, so replies and progress updates reach you during your working day.
In milestones. You pay after you approve each milestone, and on Standard and Premium packages you get your money back at any milestone if the work isn't right.
Yes, if you need it. Most clients send us their own design and we draft and model from it, but we can also take on the design itself, from concept to construction drawings.
We don't model MEP. We coordinate the models your MEP consultant produces, checking them against the architecture and each other. For meaningful coordination, MEP models should be at least LOD 300.
Yes. Models are combined and clash-tested in Navisworks. Reports are delivered as HTML or Excel, and as BCF if your team uses ACC or Revizto, so issues go straight into your platform.
Both. Clashes are grouped, false clashes removed and the rest prioritised. Each clash in our report comes with a proposed resolution and the discipline responsible for fixing it.
Your MEP consultant. We don't carry out MEP calculations or design. Our role is coordination, and design responsibility stays with your consultants throughout.
A one-off coordination on a finished model, such as a fit-out or villa, takes around 1 to 3 weeks. Periodic coordination usually runs a clash round every week or two until the end of design.
Drafting and BIM support for architecture and fit-out teams in Dubai.
Revit models up to LOD 350, with native files, PDF/DWG sheets and schedules.
View service →Navisworks clash reports, combined services and builder's work drawings.
View service →Permit and CD sets for your consultant to stamp and submit to DM, DDA or Trakhees.
View service →Partitions, RCP, joinery and coordinated MEP, ready for authority approval.
View service →Joinery, ceiling and partition shop drawings, ready for consultant approval and the workshop.
View service →Tagged FF&E plans and a schedule you can buy from, in AutoCAD or Revit, with a spec sheet per item.
View service →Not sure about scope or budget? Estimate your cost in 2 minutes →