Permit Drawings & Construction Document Sets

Bonarch Draft prepares permit drawings and construction document sets for architecture firms, consultancies and fit-out contractors in the UAE and Canada, under your title block, for your architect or registered consultant to stamp and submit. Sets run USD 30–55 per A1 sheet in AutoCAD or USD 45–85 in Revit; a small fit-out permit set takes 1–2 weeks and a villa set 3–8 weeks, not counting authority review.

Prepared for your consultant's stamp
UAE & Ontario permit sets
Permit sets & full CD sets
Point-by-point comment responses
Project-based pricing

Permit sets and construction documents

A permit set proves to the authority that the design complies with the regulations. A CD set shows the contractor exactly what to build.

Permit Sets
  • Site plan
  • Plans, sections and elevations
  • Code analysis
  • Fire and life safety plans: exits, travel distances, fire ratings
  • Accessibility
  • Area and use schedule
Construction Documents
  • Everything in the permit set, plus:
  • Details and wall types
  • Door, window and finish schedules
  • Reflected ceiling plans (RCP)
  • Interior elevations and millwork
  • Specifications
Who Does What
  • We prepare the set under your title block
  • Your consultant reviews, stamps and signs it
  • Your consultant submits it to the authority
  • We never submit to authorities directly

Structural and MEP sheets come from your consultants. We coordinate them against the architecture and run clash checks; see our MEP coordination service.

How we Work

You send your finished design, or bring us in during design development and we produce the drawings and model alongside your design team.

Scope review: the authority, the set type and your consultant's requirements are confirmed before production starts.

Production: the set is prepared under your or your consultant's title block and coordinated with your structural and MEP consultants' drawings.

Submission by your consultant: your consultant reviews, stamps, signs and submits the set. We never submit to authorities ourselves.

Authority comments: we answer each comment point by point in a response letter, cloud the changes, update the revision table and reissue the set to your consultant.

Where your set goes

In the UAE, your consultant submits to the authority that governs the site: Dubai Municipality for most projects in the city, DDA for free zones such as Dubai Design District, Trakhees for Jebel Ali and the ports, Dubai Civil Defence for fire and life safety, and master developers such as Nakheel and Emaar where they run their own approvals. We prepare the set to the requirements your consultant specifies for that submission. In Canada, your architect or the permit applicant submits the set to the municipality’s building department. We have produced the 129-sheet building permit set for a 37-storey residential tower in Vaughan, Ontario, and a 23-sheet rezoning set for a 12-storey mixed-use building in Mississauga.

Where we start

Most projects start from your finished design. On projects still in design, we can work alongside your design team through design development, producing the drawings and the model as the design evolves and is corrected.

Typical timelines

Typical production times (authority review time is not included):

  • Small fit-out permit set: 1 to 2 weeks
  • Villa permit or CD set: 3 to 8 weeks
  • Larger projects: 2 to 4 months

Frequently asked questions​

How much does it cost?

Priced per sheet: USD 30–55 per A1 sheet in AutoCAD and USD 45–85 in Revit, depending on the package. We fix the final price once we see your sheet list.

Where is your team?

Bonarch Draft is based in Toronto, and our production team works from the Middle East on Dubai hours. You get written progress updates daily or every other day, and we agree call times with you at the start of the project.

How do we pay?

In milestones. You pay after you approve each milestone, and on Standard and Premium packages you get your money back at any milestone if the work isn't right.

Do you design?

No. We don't design. We produce the drawings and Revit models from your design or your consultant's, and design responsibility stays with you.

Do you submit permits to the authorities?

No. We prepare the set under your or your consultant's title block. Your registered consultant reviews, stamps, signs and submits it. Bonarch never submits drawings to an authority directly.

Are you familiar with the authorities' requirements?

Yes. In the UAE we know how permit sets are structured for Dubai Municipality, DDA, Trakhees and Dubai Civil Defence. In Canada we have produced building permit and rezoning sets for projects in Vaughan and Mississauga, Ontario. In both cases we follow the specific requirements your architect or consultant sets for each submission.

What happens when the authority comments on the set?

We answer each comment point by point in a response letter, cloud the changes on the drawings, update the revision table and reissue the set to your consultant for resubmission.

How long does a permit or CD set take?

A small fit-out permit set takes 1 to 2 weeks, a villa permit or CD set 3 to 8 weeks, and larger projects 2 to 4 months. Authority review time is not included.

What do you start from?

Usually your finished design. On projects still in design, we can work alongside your design team through design development, producing the drawings and model as the design evolves.

Can you work to our office templates and standards?

Yes. We work inside your own templates, title blocks, naming conventions and sheet structure, so the set reads like it came from your office.

Do you deliver native files?

Yes. We deliver the native Revit model with all families embedded, the sheets in PDF and DWG, and the schedules, so your team can keep working on the set after handover.

Do you cover structural and MEP drawings?

We don't produce structural or MEP drawings. We coordinate your consultants' drawings against the architecture and run clash checks. Our core is architecture, plus interior and fit-out.

Tell Us About Your Project
Where is your project located?

By sending this form you agree to our Privacy Policy.

Related services

Drafting and BIM support for architecture and fit-out teams in the UAE and Canada.

Not sure about scope or budget? Estimate your cost in 2 minutes →

New · 2026Dubai Circular 9-1-3: BIM is now required above G+12 and 15,000 m²What the circular says, which projects it covers, and how to prepare your permit set.Read the guide →