Fit-Out Drawings
Fit-Out Drawings in Dubai, Ready for Approval and Site
Bonarch Draft produces fit-out drawings in Dubai for architecture firms, fit-out contractors and consultancies: partition and ceiling layouts, joinery details and coordinated MEP, turned from your approved design into a set ready for approval and site. Sets run USD 85–140 per A1 sheet in AutoCAD or USD 120–210 in Revit; a small fit-out set takes 1–2 weeks and a full office fit-out around 5 weeks.
What's in a Bonarch fit-out package
A complete fit-out package is far more than a set of plans. Depending on your scope, a typical Bonarch deliverable includes:
- Partition layouts
- Demolition layouts
- Furniture layouts
- Reflected ceiling plans (RCP)
- GA sections
- Power layouts
- AC/mechanical coordination layouts
- Fire fighting layouts
- Emergency light layouts
- Floor finishes layouts
- Wall finishes layouts
- Interior elevations
- Finish schedules
- Fully detailed custom joinery (display walls, counters, storage, shelving, desks)
- Feature elements and bespoke units
- Door plans and door details
- Glass partitions, sliding and pocket doors
How we Work
You send what you have sketches or hand drawings, 2D AutoCAD or PDF, point cloud scans, or 3D files (SketchUp, AutoCAD, Rhino, 3ds Max). We review it and confirm scope before production starts.
Scope & standards review model condition, LOD needs, coordination requirements, your standards and references, sheet structure, and timeline.
Clear estimate pricing, assumptions, milestones, and delivery workflow before the team begins.
Production & coordination our team models, drafts, details, and coordinates, flagging and resolving conflicts as we go.
Delivery a clean, coordinated, execution-ready package on the agreed timeline.
Timelines depend on scope and deliverables. As a reference: a full commercial office fit-out package in Dubai Design District was completed on a normal 5-week schedule.
Software & standards
We produce natively in Revit, with AutoCAD used where your workflow requires it. Modeling is delivered from LOD 100 through LOD 350, matched to your project needs. All documentation follows your standards and references layer conventions, naming, and sheet structure aligned to how your team already works.
The coordination problems we catch
Most delays and rework on site come from conflicts that should have been caught on the drawings. Bonarch’s packages are reviewed to catch and resolve:
- Clashes between architectural and mechanical (MEP) elements
- Conflicts between structure, architecture, and interior fit-out
- Dimensional conflicts across the set
- Execution details that don’t match existing site conditions
- Coordination gaps between disciplines before they reach the contractor
Frequently asked questions
Related services
Drafting and BIM support for architecture and fit-out teams in Dubai.
BIM Modeling
Revit models up to LOD 350, with native files, PDF/DWG sheets and schedules.
View service →MEP Coordination & Clash Detection
Navisworks clash reports, combined services and builder's work drawings.
View service →Permit & CD Packages
Permit and CD sets for your consultant to stamp and submit to DM, DDA or Trakhees.
View service →Fit-Out Drawings
Partitions, RCP, finishes and coordinated MEP, ready for approval and site.
View service →Shop Drawings
Joinery, ceiling and partition shop drawings, ready for consultant approval and the workshop.
View service →Not sure about scope or budget? Estimate your cost in 2 minutes →